This 175,000 square secondary school features three distinct building blocks that step down to follow the existing grades, with a three-storey academic block, a two-storey central block with commons area, cafeteria and stage, chapel, classrooms, and media resource center, as well as an athletic and broadband technology block with triple gymnasium, exercise room and four technology labs.
The $35 million high school required 121 foot deep pile foundations due to unstable soil conditions.